Saturday, October 18, 2025
Energy Transition Outlook Report 2023
HomeEV & BatteryThe Rivian R2 And R3 Won’t Be Built In Georgia Until At...

The Rivian R2 And R3 Won’t Be Built In Georgia Until At Least 2028

The R2 is still slated to go into production in 2026 at the Normal, Illinois plant, but can Rivian survive until then?
RELATED ARTICLES
- Advertisment -
Energy Jobline LinkedIn

Most Popular

Recent Comments