Friday, October 17, 2025
Energy Transition Outlook Report 2023
HomeRenewablesAberdeenshireAdvancing major UK power link project supply chain

Advancing major UK power link project supply chain

Tendering has opened for the cable and converter work packages of the Eastern Green Link 3 (EGL3) HVDC connection project, a collaboration between SSEN Transmission and National Grid Electricity Transmission.

This project, designed to transfer renewable energy from Scotland to the rest of the UK, will span approximately 680 kilometres, combining onshore and subsea cabling.

The EGL3 initiative proposes a 2GW bi-pole, 525kV HVDC link between Peterhead in Aberdeenshire and Norfolk, aiming to enhance the transmission efficiency of renewable energy to meet national net zero goals.

Scheduled for completion by 2033, EGL3 represents the largest HVDC transmission project planned in the UK.

It forms a crucial component of SSEN Transmission’s Pathway to 2030 programme, involving a £20 billion investment to bolster Scotland’s renewable energy infrastructure.

Energy Live News
Energy Live Newshttps://www.energylivenews.com
This article first appeared on Energy Live News, an award winning news service. Their mission is to give you balanced news, analysis, commentary of energy from their dedicated team of quality journalists and production staff.
RELATED ARTICLES
- Advertisment -
Energy Jobline LinkedIn

Most Popular

Recent Comments